EcoStruxure Building (SpaceLogic AS-P-NLS) مبنى الأتمتة الخادم (BMS Network المراقب المالي) with Secure Boot. Designed for HVAC, إضاءة, chilled water & heat source control, alarm management, trend logging and protocol gateway applications.
✅ Model Code Definition
AS-P: SpaceLogic Automation Server Premium (high-end automation server)
NLS: N = No LON bus; L = Zigbee wireless support; S = Secure Boot firmware verification
مقارنة: AS-P-NL (SXWASPXXX10002) without Secure Boot; AS-P-NLS equipped with anti-tampering firmware authentication.
📌 Hardware Ports
2 × آر جيه 45 10/100 Mbps Ethernet (LAN1/LAN2, dual-port network isolation supported)
2 × RS485 field buses (إم باص, Modbus RTU compatible)
1 × I/O Bus for SpaceLogic I/O expansion modules
1 × USB Device (program download & التكليف)
1 × مضيف USB (USB storage, Zigbee wireless adapter)
📋 Core Technical Specifications
مزود الطاقة: 24 VDC
Max power consumption: 10 دبليو
ذاكرة: 512 ميغابايت من ذاكرة الوصول العشوائي / 4 جي بي فلاش
تصنيف الضميمة: IP20, تركيب السكك الحديدية DIN
أبعاد: 90(دبليو) × 114(ح) × 64(د) مم
الوزن الصافي: 0.321 كجم
درجة حرارة التشغيل: 0 ~ +50 درجه مئوية; درجة حرارة التخزين: -20 ~ +70 درجه مئوية
رطوبة: ≤95% RH, غير التكثيف
🧩 Protocols & الوظائف الأساسية
BACnet IP, BACnet/SC (Secure Connect), مودبوس تي سي بي/آر تي يو
Zigbee wireless device integration
Control logic execution, trend logging, alarm management, user access control
Standalone operation or zone controller under upper-level servers; acts as multi-protocol gateway
Secure Boot: prevents firmware tampering, ideal for high-security projects (المستشفيات, مراكز البيانات)
⚠️ Product Lifecycle (Critical Information)
End of Order (EOO): 31 Dec 2026
End of Service (EOS): 31 Dec 2029
نموذج الاستبدال الموصى به: SXWASP3XX10001 (AS-P-3 V3 New Generation)
Upgrade highlights for AS-P-3: Gigabit Ethernet port, 3 RS485 ports, dual USB Host ports, أداء أعلى, fully compatible with EcoStruxure toolchain.
📎 Matching Accessories
TB-ASP-W1: Terminal base
PS-24V: 24 مصدر طاقة VDC
Zigbee USB adapter, SXW series I/O expansion modules
📝 Quick Selection Comparison Table
| رقم الجزء | Short Name | Secure Boot | LON Bus | Zigbee |
| SXWASPSBX10002 | AS-P-NLS | نعم | لا | نعم |
| SXWASPXXX10002 | AS-P-NL | لا | لا | نعم |
| SXWASPSBX10001 | AS-P-S | نعم | نعم | لا |
Migration Guidelines: AS-P-NLS (SXWASPSBX10002) → AS-P-3 (SXWASP3XX10001)
Core Tool: Device Administrator – Convert backup set server type (do NOT restore backup directly). Minimum EBO version requirement: EBO 7.0 or later. Older EBO versions cannot recognize AS-P-3.
الشروط المسبقة: Offline full backup, field trial first, scheduled downtime, rollback plan prepared.
- هجرة البرنامج (EBO Project, منطق التحكم, Scripts, Licenses)
- Backup & Conversion Workflow (Most Critical Step)
- Perform a full online backup of the legacy AS-P-NLS (including control programs, trends, إنذار, permissions, gateway settings, TGML graphics). Never restore this backup directly onto AS-P-3.
- Open the backup set in Device Administrator, run the Convert backup set server type function to change the target device type from AS-P to AS-P-3. Only converted backups can be downloaded to the new controller.
- Most control logic, FBD, ST programs, schedules, alarm strategies and trend configurations remain fully compatible after conversion, no program rewriting required.
- Always open the converted project in WorkStation and run a full compile check to eliminate errors and warnings.
- Key Compatibility Checks
✅ Standard HVAC, BACnet and Modbus function blocks are fully compatible.
⚠️ Custom third-party drivers, user-defined C-scripts and special driver packages must be validated for AS-P-3 compatibility; older drivers may not work.
Zigbee Compatibility: The original Zigbee USB adapter works on AS-P-3, but the USB port path changes (legacy: 1 USB Host; جديد: 2 USB Host ports). Update the USB device path inside the project.
Secure Boot: Certificates and BACnet/SC credentials are retained after conversion; re-export and validate certificates after migration.
❌ Incompatibility Risks:
- Legacy AS-P exclusive system variables and status objects
- Hardcoded USB/COM port numbers in TGML graphics
- TLS version mismatch: AS-P-NLS uses TLS 1.0 while AS-P-3 defaults to TLS 1.3. Email alerts and web access will fail due to handshake errors; adjust mail server TLS settings accordingly.
✅ License Note: The original AS-P software license cannot be migrated directly. Apply for license re-binding with the new AS-P-3 serial number in advance via شنايدر license transfer process.
- Post-Migration Testing Items
- Full project compilation, resolve all errors & warnings
- Offline simulation of control sequences, PID loops and interlocks
- Verify alarm forwarding, trend recording and event logging
- Test TGML graphic access and point read/write permissions
- I/O Bus & I/O Mapping (Top Risk Area – Hardware Topology Changed)
Legacy AS-P uses TB-ASP-W1 terminal base with different I/O Bus addressing and power budget. AS-P-3 is an integrated unit without a separate base.
- I/O Bus Address Rule Change (Most Common Failure)
Legacy AS-P: Server occupies I/O Bus address 1
AS-P-3: Server is fixed at I/O Bus address 2. I/O modules start from address 3, الحد الأقصى 32 nodes (الأعلى 31 I/O devices).
Direct migration will cause I/O address offset, module offline and wrong point readings.
Two solutions:
- Rearrange the physical I/O Bus topology, reassign addresses following AS-P-3 rules, then cross-check I/O mapping table in the project (مُستَحسَن).
- Modify each I/O module’s bus address inside the project to match physical wiring.
Wiring rule: Install AS-P-3 on the far left of the DIN rail; I/O modules extend rightwards. موضع 1 is reserved and unavailable.
- I/O Bus Power Budget
Legacy AS-P base has limited power output; AS-P-3 built-in I/O Bus power: الأعلى 20 دبليو. Add an external 30 W I/O bus power supply if the total power consumption exceeds the limit, otherwise modules will drop offline randomly.
Calculate total module power consumption before migration.
- I/O Mapping Validation
DI/DO/AI/AO channel definitions remain unchanged; only the I/O Bus address is updated.
Verify every item after download: module number, bus address, channel number, forced values, channel inversion and filter parameters.
SXW series I/O modules are fully interchangeable between legacy AS-P and AS-P-3; no hardware replacement needed.
ثالثا. تكوين الشبكة (Ethernet Ports, RS485, باك نت, بوابات)
- Ethernet Port Comparison
Legacy AS-P-NLS: 2 × 10/100 Mbps LAN (LAN1/LAN2)
AS-P-3: المنفذ1 (10/100/1000 جيجابت), Port2 & Port3 (10/100 ميغابت في الثانية). 3 ports total, supports RSTP and isolated private subnets.
Major Pitfall: Port numbering and subnet roles have changed.
- IP Planning: Keep the same Device Name and BACnet Device ID to avoid reconfiguration on upper BMS and third-party integration systems.
- Port Role Reassignment:
Port1 = Main WAN (BMS backbone network)
Port2 / Port3 = WAN or Private Network (شكلي)
All static routes, BACnet IP interfaces and gateway bindings previously assigned to LAN1/LAN2 must be re-bound to the new AS-P-3 port numbers, otherwise BACnet IP communication and cross-subnet routing will break.
- BACnet Settings
BACnet IP and BACnet/SC protocols are compatible. Certificates are preserved after backup conversion, but TLS 1.3 is enabled on AS-P-3; BACnet/SC clients must support TLS 1.3.
Re-scan BACnet routers, BBMD and external device subscriptions after migration.
- RS485 Serial Ports (COM Ports)
Legacy AS-P: COM A, COM B (2 RS485 ports)
AS-P-3: COM A, COM B, COM C (3 RS485 ports)
مودبوس ار تي يو / MS/TP programs referencing COM A/B do not require editing; only re-terminate field wiring to the new terminal block.
Bus biasing and termination resistors: AS-P-3 has different built-in biasing characteristics. Retest bus waveform and adjust termination resistors on long-distance MS/TP buses to eliminate intermittent communication loss.
- Additional Network Services
Recheck NTP, DNS, static routes, VPN and SNMP settings; re-bind all network objects to the correct physical ports.
- الأجهزة, الأسلاك & Installation Differences (Field Implementation)
- مزود الطاقة: Legacy AS-P requires separate PS-24V power module; AS-P-3 has integrated power supply, directly powered by 24 بطالة / 24~30 VDC. The external PS-24V can be removed from the cabinet.
- Mechanical Size: Legacy AS-P + قاعدة + مزود الطاقة; AS-P-3 integrated body matches the overall size of legacy AS-P plus PS-24V. DIN rail mounting position is interchangeable, but terminal layout differs – do not reuse existing pre-wired terminal plugs; re-crimp all field wires.
- USB Interfaces: Legacy: 1 Mini-B debug + 1 USB-A Host; جديد: 1 USB-C debug + 2 USB-A Host. After plugging the Zigbee adapter into the new USB Host, update the USB instance path inside the project.
- تبديد الحرارة: AS-P-3 has higher power consumption. Install horizontally on DIN rail with sufficient top & bottom ventilation; avoid dense stacking.
- Step-by-Step Migration Procedure (Minimize Downtime Risk)
- Before shutdown: Create full project backup, export I/O mapping table, network parameters, BACnet device list, Modbus point list and Zigbee device inventory; keep hard copies.
- Upgrade EBO WorkStation to V7.0+, and install the matching Device Administrator version.
- Convert the backup to AS-P-3 format, compile the project and complete offline simulation testing.
- Replace the controller hardware inside the cabinet, rewire I/O Bus, 24قوة الخامس, RS485 buses, Ethernet and Zigbee adapter.
- Flash the latest firmware to AS-P-3, import the converted backup and activate the software license.
- Power up step by step: First I/O Bus, then RS485 field buses, finally the backbone Ethernet network.
- Full point verification: I/O channels, field bus communication, باك نت, مودبوس, إنذار, trends, graphics and Zigbee sub-devices.
- 24-hour continuous trial run. Keep the original AS-P-NLS as rollback spare hardware; do not remove it immediately.
- Common Post-Migration Troubleshooting
- I/O modules offline: Wrong I/O Bus address (server address changed from 1 ل 2), incorrect physical topology, or total bus power exceeds 20 W limit.
- Intermittent Modbus/MS/TP communication: Improper bus biasing or termination resistors, or COM port binding mismatch.
- Upper BMS cannot read BACnet points: WAN/Private subnet misconfiguration, BBMD error or duplicate BACnet Device ID.
- Zigbee devices offline: USB Host instance path not updated in the project.
- Email notification failure: TLS version incompatibility (mail server does not support TLS 1.3).
- Backup restore error: Direct restore without running the Convert backup set server type tool.
Full Model List of the Series
1st Generation AS-P (توقف, with TB-ASP-W1 Base)
Standard HVAC Models
| Short Model | رقم الجزء | LON Bus | Zigbee | Secure Boot | ملاحظات |
| AS-P | SXWASPXXX10001 | نعم | لا | لا | Basic model with LON |
| AS-P-S | SXWASPSBX10001 | نعم | لا | نعم | Secure Boot + LON |
| AS-P-NL | SXWASPXXX10002 | لا | نعم | لا | No LON, Zigbee wireless |
| AS-P-NLS | SXWASPSBX10002 | لا | نعم | نعم | No LON + Zigbee + Secure Boot |
| AS-P-SBA | SXWASPSBX10A01 | نعم | لا | نعم | BAA Buy American Act compliant |
UL864 Smoke Control (SMK) Fire Models
| Short Model | رقم الجزء | LON | Zigbee | Secure Boot | |
| AS-P-SMK | SXWASPXXX1S001 | نعم | لا | لا | Smoke control firmware |
| AS-P-NLS-SMK | SXWASPSBX1S002 | لا | نعم | نعم | Smoke control + Zigbee + Secure Boot |
Terminal Bases (Mandatory Accessories)
- TB-ASP-W1: SXWTBASW110002 (Standard projects)
- TB-ASP-W1-BAA: SXWTBASW110A02 (BAA-compliant projects)
2nd Generation AS-P-3 V3 (استبدال جديد, Integrated Unit, No Base Required)
All models include Secure Boot; EBO V7.0+ required.
| Short Model | رقم الجزء | LON Bus | RS485 Ports | Ethernet Ports | Legacy Replacement |
| AS-P-3 | SXWASP3XX10001 | لا | 3 | 1 جيجابت + 2 إيثرنت سريع | AS-P-NL / AS-P-NLS (SXWASPSBX10002) |
| AS-P-L-3 | SXWASPL3X10001 | نعم | 2 | 1 جيجابت + 2 إيثرنت سريع | AS-P / AS-P-S (LON retained) |
الفرق الرئيسي: AS-P-3 has one extra RS485 port; AS-P-L-3 keeps LON bus with one fewer RS485 port.
Model Coding Breakdown (SXWASPSBX10002)
- SXWASP = SpaceLogic AS-P Automation Server
- 6الحرف ال: S = Secure Boot enabled; X = No Secure Boot
- 7الحرف ال: B = No LON bus; L = LON bus enabled
- 8الحرف ال: X = No Zigbee; L = Zigbee enabled
- لاحقة 10001/10002 = Version & compliance variant; S = SMK smoke control firmware
End-of-Life Replacement Mapping Table
- SXWASPSBX10002 (AS-P-NLS) → SXWASP3XX10001 (AS-P-3)
- SXWASPXXX10002 (AS-P-NL) → SXWASP3XX10001
- SXWASPSBX10001 (AS-P-S) → SXWASPL3X10001 (AS-P-L-3, LON retained)
- SXWASPXXX10001 (AS-P) → SXWASPL3X10001
وحدات الإدخال/الإخراج المتوافقة (SXW Series, Interchangeable Between Old & New Servers)
UI-8/AO-V-4, UI-16, DI-16, DO-FC-8, AO-8, RTD-DI-16, إلخ. No hardware replacement needed; only update I/O Bus address settings.
المقاولين,قاطع الدائرة,الاستشعار,التشفير,بلك,محول



















NH42-63-318x560.png)