شنايدر SXWASPSBX10002 وحدة تحكم الشبكة BMS - المقاولين,قاطع الدائرة,الاستشعار,التشفير,بلك,محول

ويشات: +86-13184948252 واتس اب: 0086-13811255435 بريد إلكتروني: كينت@bestcontactor.com

عن اتصال |

 شنايدر SXWASPSBX10002 وحدة تحكم الشبكة BMS - المقاولين,قاطع الدائرة,الاستشعار,التشفير,بلك,محول

بلك/

شنايدر SXWASPSBX10002 وحدة تحكم الشبكة BMS

EcoStruxure Building (SpaceLogic AS-P-NLS) Building Automation Server (BMS Network Controller) with Secure Boot. Designed for HVAC, إضاءة, chilled water & heat source control, alarm management, trend logging and protocol gateway applications. ✅ Model Code Definition AS-P: SpaceLogic Automation Server Premium (high-end automation server) NLS: N = No LON bus; L = Zigbee wireless support; س ...

  • تفاصيل المنتج

EcoStruxure Building (SpaceLogic AS-P-NLS) مبنى الأتمتة الخادم (BMS Network المراقب المالي) with Secure Boot. Designed for HVAC, إضاءة, chilled water & heat source control, alarm management, trend logging and protocol gateway applications.

✅ Model Code Definition

AS-P: SpaceLogic Automation Server Premium (high-end automation server)

NLS: N = No LON bus; L = Zigbee wireless support; S = Secure Boot firmware verification

مقارنة: AS-P-NL (SXWASPXXX10002) without Secure Boot; AS-P-NLS equipped with anti-tampering firmware authentication.

📌 Hardware Ports

2 × آر جيه 45 10/100 Mbps Ethernet (LAN1/LAN2, dual-port network isolation supported)

2 × RS485 field buses (إم باص, Modbus RTU compatible)

1 × I/O Bus for SpaceLogic I/O expansion modules

1 × USB Device (program download & التكليف)

1 × مضيف USB (USB storage, Zigbee wireless adapter)

📋 Core Technical Specifications

مزود الطاقة: 24 VDC

Max power consumption: 10 دبليو

ذاكرة: 512 ميغابايت من ذاكرة الوصول العشوائي / 4 جي بي فلاش

تصنيف الضميمة: IP20, تركيب السكك الحديدية DIN

أبعاد: 90(دبليو) × 114(ح) × 64(د) مم

الوزن الصافي: 0.321 كجم

درجة حرارة التشغيل: 0 ~ +50 درجه مئوية; درجة حرارة التخزين: -20 ~ +70 درجه مئوية

رطوبة: ≤95% RH, غير التكثيف

🧩 Protocols & الوظائف الأساسية

BACnet IP, BACnet/SC (Secure Connect), مودبوس تي سي بي/آر تي يو

Zigbee wireless device integration

Control logic execution, trend logging, alarm management, user access control

Standalone operation or zone controller under upper-level servers; acts as multi-protocol gateway

Secure Boot: prevents firmware tampering, ideal for high-security projects (المستشفيات, مراكز البيانات)

⚠️ Product Lifecycle (Critical Information)

End of Order (EOO): 31 Dec 2026

End of Service (EOS): 31 Dec 2029

نموذج الاستبدال الموصى به: SXWASP3XX10001 (AS-P-3 V3 New Generation)

Upgrade highlights for AS-P-3: Gigabit Ethernet port, 3 RS485 ports, dual USB Host ports, أداء أعلى, fully compatible with EcoStruxure toolchain.

📎 Matching Accessories

TB-ASP-W1: Terminal base

PS-24V: 24 مصدر طاقة VDC

Zigbee USB adapter, SXW series I/O expansion modules

📝 Quick Selection Comparison Table

رقم الجزءShort NameSecure BootLON BusZigbee
SXWASPSBX10002AS-P-NLSنعملانعم
SXWASPXXX10002AS-P-NLلالانعم
SXWASPSBX10001AS-P-Sنعمنعملا

Migration Guidelines: AS-P-NLS (SXWASPSBX10002) → AS-P-3 (SXWASP3XX10001)

Core Tool: Device Administrator – Convert backup set server type (do NOT restore backup directly). Minimum EBO version requirement: EBO 7.0 or later. Older EBO versions cannot recognize AS-P-3.

الشروط المسبقة: Offline full backup, field trial first, scheduled downtime, rollback plan prepared.

  1. هجرة البرنامج (EBO Project, منطق التحكم, Scripts, Licenses)
  2. Backup & Conversion Workflow (Most Critical Step)
  3. Perform a full online backup of the legacy AS-P-NLS (including control programs, trends, إنذار, permissions, gateway settings, TGML graphics). Never restore this backup directly onto AS-P-3.
  4. Open the backup set in Device Administrator, run the Convert backup set server type function to change the target device type from AS-P to AS-P-3. Only converted backups can be downloaded to the new controller.
  5. Most control logic, FBD, ST programs, schedules, alarm strategies and trend configurations remain fully compatible after conversion, no program rewriting required.
  6. Always open the converted project in WorkStation and run a full compile check to eliminate errors and warnings.
  7. Key Compatibility Checks

✅ Standard HVAC, BACnet and Modbus function blocks are fully compatible.

⚠️ Custom third-party drivers, user-defined C-scripts and special driver packages must be validated for AS-P-3 compatibility; older drivers may not work.

Zigbee Compatibility: The original Zigbee USB adapter works on AS-P-3, but the USB port path changes (legacy: 1 USB Host; جديد: 2 USB Host ports). Update the USB device path inside the project.

Secure Boot: Certificates and BACnet/SC credentials are retained after conversion; re-export and validate certificates after migration.

❌ Incompatibility Risks:

  1. Legacy AS-P exclusive system variables and status objects
  2. Hardcoded USB/COM port numbers in TGML graphics
  3. TLS version mismatch: AS-P-NLS uses TLS 1.0 while AS-P-3 defaults to TLS 1.3. Email alerts and web access will fail due to handshake errors; adjust mail server TLS settings accordingly.

✅ License Note: The original AS-P software license cannot be migrated directly. Apply for license re-binding with the new AS-P-3 serial number in advance via شنايدر license transfer process.

  1. Post-Migration Testing Items
  2. Full project compilation, resolve all errors & warnings
  3. Offline simulation of control sequences, PID loops and interlocks
  4. Verify alarm forwarding, trend recording and event logging
  5. Test TGML graphic access and point read/write permissions
  6. I/O Bus & I/O Mapping (Top Risk Area – Hardware Topology Changed)

Legacy AS-P uses TB-ASP-W1 terminal base with different I/O Bus addressing and power budget. AS-P-3 is an integrated unit without a separate base.

  1. I/O Bus Address Rule Change (Most Common Failure)

Legacy AS-P: Server occupies I/O Bus address 1

AS-P-3: Server is fixed at I/O Bus address 2. I/O modules start from address 3, الحد الأقصى 32 nodes (الأعلى 31 I/O devices).

Direct migration will cause I/O address offset, module offline and wrong point readings.

Two solutions:

  1. Rearrange the physical I/O Bus topology, reassign addresses following AS-P-3 rules, then cross-check I/O mapping table in the project (مُستَحسَن).
  2. Modify each I/O module’s bus address inside the project to match physical wiring.

Wiring rule: Install AS-P-3 on the far left of the DIN rail; I/O modules extend rightwards. موضع 1 is reserved and unavailable.

  1. I/O Bus Power Budget

Legacy AS-P base has limited power output; AS-P-3 built-in I/O Bus power: الأعلى 20 دبليو. Add an external 30 W I/O bus power supply if the total power consumption exceeds the limit, otherwise modules will drop offline randomly.

Calculate total module power consumption before migration.

  1. I/O Mapping Validation

DI/DO/AI/AO channel definitions remain unchanged; only the I/O Bus address is updated.

Verify every item after download: module number, bus address, channel number, forced values, channel inversion and filter parameters.

SXW series I/O modules are fully interchangeable between legacy AS-P and AS-P-3; no hardware replacement needed.

ثالثا. تكوين الشبكة (Ethernet Ports, RS485, باك نت, بوابات)

  1. Ethernet Port Comparison

Legacy AS-P-NLS: 2 × 10/100 Mbps LAN (LAN1/LAN2)

AS-P-3: المنفذ1 (10/100/1000 جيجابت), Port2 & Port3 (10/100 ميغابت في الثانية). 3 ports total, supports RSTP and isolated private subnets.

Major Pitfall: Port numbering and subnet roles have changed.

  1. IP Planning: Keep the same Device Name and BACnet Device ID to avoid reconfiguration on upper BMS and third-party integration systems.
  2. Port Role Reassignment:

Port1 = Main WAN (BMS backbone network)

Port2 / Port3 = WAN or Private Network (شكلي)

All static routes, BACnet IP interfaces and gateway bindings previously assigned to LAN1/LAN2 must be re-bound to the new AS-P-3 port numbers, otherwise BACnet IP communication and cross-subnet routing will break.

  1. BACnet Settings

BACnet IP and BACnet/SC protocols are compatible. Certificates are preserved after backup conversion, but TLS 1.3 is enabled on AS-P-3; BACnet/SC clients must support TLS 1.3.

Re-scan BACnet routers, BBMD and external device subscriptions after migration.

  1. RS485 Serial Ports (COM Ports)

Legacy AS-P: COM A, COM B (2 RS485 ports)

AS-P-3: COM A, COM B, COM C (3 RS485 ports)

مودبوس ار تي يو / MS/TP programs referencing COM A/B do not require editing; only re-terminate field wiring to the new terminal block.

Bus biasing and termination resistors: AS-P-3 has different built-in biasing characteristics. Retest bus waveform and adjust termination resistors on long-distance MS/TP buses to eliminate intermittent communication loss.

  1. Additional Network Services

Recheck NTP, DNS, static routes, VPN and SNMP settings; re-bind all network objects to the correct physical ports.

  1. الأجهزة, الأسلاك & Installation Differences (Field Implementation)
  2. مزود الطاقة: Legacy AS-P requires separate PS-24V power module; AS-P-3 has integrated power supply, directly powered by 24 بطالة / 24~30 VDC. The external PS-24V can be removed from the cabinet.
  3. Mechanical Size: Legacy AS-P + قاعدة + مزود الطاقة; AS-P-3 integrated body matches the overall size of legacy AS-P plus PS-24V. DIN rail mounting position is interchangeable, but terminal layout differs – do not reuse existing pre-wired terminal plugs; re-crimp all field wires.
  4. USB Interfaces: Legacy: 1 Mini-B debug + 1 USB-A Host; جديد: 1 USB-C debug + 2 USB-A Host. After plugging the Zigbee adapter into the new USB Host, update the USB instance path inside the project.
  5. تبديد الحرارة: AS-P-3 has higher power consumption. Install horizontally on DIN rail with sufficient top & bottom ventilation; avoid dense stacking.
  6. Step-by-Step Migration Procedure (Minimize Downtime Risk)
  7. Before shutdown: Create full project backup, export I/O mapping table, network parameters, BACnet device list, Modbus point list and Zigbee device inventory; keep hard copies.
  8. Upgrade EBO WorkStation to V7.0+, and install the matching Device Administrator version.
  9. Convert the backup to AS-P-3 format, compile the project and complete offline simulation testing.
  10. Replace the controller hardware inside the cabinet, rewire I/O Bus, 24قوة الخامس, RS485 buses, Ethernet and Zigbee adapter.
  11. Flash the latest firmware to AS-P-3, import the converted backup and activate the software license.
  12. Power up step by step: First I/O Bus, then RS485 field buses, finally the backbone Ethernet network.
  13. Full point verification: I/O channels, field bus communication, باك نت, مودبوس, إنذار, trends, graphics and Zigbee sub-devices.
  14. 24-hour continuous trial run. Keep the original AS-P-NLS as rollback spare hardware; do not remove it immediately.
  15. Common Post-Migration Troubleshooting
  16. I/O modules offline: Wrong I/O Bus address (server address changed from 1 ل 2), incorrect physical topology, or total bus power exceeds 20 W limit.
  17. Intermittent Modbus/MS/TP communication: Improper bus biasing or termination resistors, or COM port binding mismatch.
  18. Upper BMS cannot read BACnet points: WAN/Private subnet misconfiguration, BBMD error or duplicate BACnet Device ID.
  19. Zigbee devices offline: USB Host instance path not updated in the project.
  20. Email notification failure: TLS version incompatibility (mail server does not support TLS 1.3).
  21. Backup restore error: Direct restore without running the Convert backup set server type tool.

Full Model List of the Series

1st Generation AS-P (توقف, with TB-ASP-W1 Base)

Standard HVAC Models

Short Modelرقم الجزءLON BusZigbeeSecure Bootملاحظات
AS-PSXWASPXXX10001نعملالاBasic model with LON
AS-P-SSXWASPSBX10001نعملانعمSecure Boot + LON
AS-P-NLSXWASPXXX10002لانعملاNo LON, Zigbee wireless
AS-P-NLSSXWASPSBX10002لانعمنعمNo LON + Zigbee + Secure Boot
AS-P-SBASXWASPSBX10A01نعملانعمBAA Buy American Act compliant

UL864 Smoke Control (SMK) Fire Models

Short Modelرقم الجزءLONZigbeeSecure Boot
AS-P-SMKSXWASPXXX1S001نعملالاSmoke control firmware
AS-P-NLS-SMKSXWASPSBX1S002لانعمنعمSmoke control + Zigbee + Secure Boot

Terminal Bases (Mandatory Accessories)

  1. TB-ASP-W1: SXWTBASW110002 (Standard projects)
  2. TB-ASP-W1-BAA: SXWTBASW110A02 (BAA-compliant projects)

2nd Generation AS-P-3 V3 (استبدال جديد, Integrated Unit, No Base Required)

All models include Secure Boot; EBO V7.0+ required.

Short Modelرقم الجزءLON BusRS485 PortsEthernet PortsLegacy Replacement
AS-P-3SXWASP3XX10001لا31 جيجابت + 2 إيثرنت سريعAS-P-NL / AS-P-NLS (SXWASPSBX10002)
AS-P-L-3SXWASPL3X10001نعم21 جيجابت + 2 إيثرنت سريعAS-P / AS-P-S (LON retained)

الفرق الرئيسي: AS-P-3 has one extra RS485 port; AS-P-L-3 keeps LON bus with one fewer RS485 port.

Model Coding Breakdown (SXWASPSBX10002)

  1. SXWASP = SpaceLogic AS-P Automation Server
  2. 6الحرف ال: S = Secure Boot enabled; X = No Secure Boot
  3. 7الحرف ال: B = No LON bus; L = LON bus enabled
  4. 8الحرف ال: X = No Zigbee; L = Zigbee enabled
  5. لاحقة 10001/10002 = Version & compliance variant; S = SMK smoke control firmware

End-of-Life Replacement Mapping Table

  1. SXWASPSBX10002 (AS-P-NLS) → SXWASP3XX10001 (AS-P-3)
  2. SXWASPXXX10002 (AS-P-NL) → SXWASP3XX10001
  3. SXWASPSBX10001 (AS-P-S) → SXWASPL3X10001 (AS-P-L-3, LON retained)
  4. SXWASPXXX10001 (AS-P) → SXWASPL3X10001

وحدات الإدخال/الإخراج المتوافقة (SXW Series, Interchangeable Between Old & New Servers)

UI-8/AO-V-4, UI-16, DI-16, DO-FC-8, AO-8, RTD-DI-16, إلخ. No hardware replacement needed; only update I/O Bus address settings.

السابق:

التالي:

ترك الرد

ترك رسالة