SIEMENS 6ES7 317-2AK14-0AB0 High-performance CPU - المقاولين,قاطع الدائرة,الاستشعار,التشفير,بلك,محول

ويشات: +86-13184948252 واتس اب: 0086-13811255435 بريد إلكتروني: كينت@bestcontactor.com

عن اتصال |

 SIEMENS 6ES7 317-2AK14-0AB0 High-performance CPU - المقاولين,قاطع الدائرة,الاستشعار,التشفير,بلك,محول

كهربائي/

SIEMENS 6ES7 317-2AK14-0AB0 High-performance CPU

6ES7: SIMATIC S7 automation series 3: S7-300 PLC platform 17: CPU317, high-performance CPU 2: Dual-interface version A: DP interface variant (no Profinet port, differs from 2EK14 PN/DP model) ك: Hardware revision code 14: Firmware version V2.7 0AB0: Product packaging code, standard German original model Full designation: CPU317-2DP, S7-300 Central Processing Unit, 1MB work memory, مزدوج ...

  • تفاصيل المنتج

6ES7: SIMATIC S7 automation مسلسل

3: S7-300 PLC platform

17: CPU317, high-performance CPU

2: Dual-interface version

أ: DP interface variant (no Profinet port, differs from 2EK14 PN/DP model)

ك: Hardware revision code

14: Firmware version V2.7

0أب0: Product packaging code, standard German original model

Full designation: CPU317-2DP, S7-300 Central Processing Unit, 1MB work memory, dual DP interfaces, MMC micro memory card mandatory

  1. المواصفات الفنية الرئيسية
  2. ذاكرة

Work memory: 1ميغابايت (program + بيانات)

Retentive memory: 256كيلو بايت

Programs, project files and firmware are fully stored on MMC card. CPU cannot start without MMC card.

  1. Execution Performance

Bit instruction: 25نانوثانية; Word instruction: 30نانوثانية; Fixed-point instruction: 40نانوثانية; Floating-point instruction: 160نانوثانية

  1. واجهات الاتصالات (2 Independent DP Ports)

Port1: MPI / بروفيبوس-DP, الأعلى. 12ميغابت في الثانية, configurable as DP master/slave

Port2: Independent PROFIBUS-DP, master/slave, dual DP bus (this model has no Ethernet Profinet port)

  1. I/O Capacity

الأعلى. digital I/O: 65536 نقاط (Process Image area: 8192 Bytes)

الأعلى. analog channels: 4096 القنوات

الأعلى. expansion racks: 3 رفوف (main rack + 3 expansion racks)

Supports FM function modules and CP communication modules

  1. كهربائي & البيانات الميكانيكية

مزود الطاقة: تيار مستمر 24 فولت, استهلاك الطاقة تقريبا. 3.5دبليو

أبعاد: 40mm×125mm×130mm, الوزن تقريبا. 0.406كجم

درجة حرارة التشغيل: 0~60 درجة مئوية (standard S7-300 range)

  1. برامج البرمجة: STEP7 V5.x, TIA Portal (Classic Mode)
  2. دورة حياة المنتج

Officially entered phase-out stage (PM400) من 2023-10-01. New project orders are no longer accepted; spare parts remain available. Circulating units on market are mainly stock items or used/refurbished modules.

Comparison within series:

6ES7317-2AJ10-0AB0: 512KB work memory, older generation; 2AK14 is upgraded version with doubled memory and improved performance. Direct replacement with AJ10 is invalid if program size exceeds 512KB.

6ES7317-2EK14-0AB0: CPU317-2PN/DP with Profinet port, 1MB work memory. Hardware base compatible with AK14, but different communication interfaces, غير قابلة للتبديل مباشرة.

  1. سيناريوهات التطبيق النموذجية

Main controller for production lines, distributed I/O systems over multi-DP buses

أدوات الآلة, علم المعادن, ورق, التعبئة والتغليف, ممحاة & plastic and other medium-to-large automation equipment

Multi-drive DP bus control with dual DP network segmentation (one bus for field I/O, one bus for inverters)

PCS7 DCS slave stations, legacy production line retrofit projects

  1. اختيار النموذج & حلول الاستبدال

5.1 Direct replacement on same platform (retrofit of legacy projects, minimal modification)

Same model: 6ES7317-2AK14-0AB0 (spare procurement. Attention required for MMC migration and firmware version matching)

⚠️Note: MMC card cannot be simply unplugged and inserted into new CPU; program and hardware configuration must be re-downloaded. Verify firmware version before replacement to avoid unexpected shutdown.

5.2 Cross-platform upgrade (الموصى بها للمشاريع الجديدة)

S7-300 discontinued, recommended upgrade to S7-1500 series:

CPU1511C-1PN / CPU1513C-1PN; existing DP bus can be retained via ET200SP IM155-6DP interface module for legacy DP slaves.

5.3 البديل المحلي

Domestic PLC (ابتكار, شينجي, Co-Trust etc.). Program and DP communication configuration must be completely rewritten. STEP7 project cannot be directly migrated. Suitable for full line renovation.

  1. تثبيت & إرشادات الصيانة
  2. Mandatory MMC requirement: Minimum 4MB, 8MB recommended. PLC fails to run if MMC is damaged or missing. All programs reside on MMC; no onboard storage in CPU.
  3. تصاعد: تركيب السكك الحديدية DIN, S7-300 backplane bus. PS307 power supply module is mandatory.
  4. Earthing: Single-end grounding for DP cable shield to reduce EMC interference. Terminating resistors configured separately for each DP bus.
  5. Status LEDs: سادس (system fault), فرنك بلجيكي (bus fault), RUN/STOP. For DP bus faults, check terminating resistors, wiring and DP address conflicts first.
  6. استكشاف الأخطاء وإصلاحها الشائعة
  7. SF ON, BF flashing: DP cable breakage, المقاوم إنهاء مفقود, slave station fault, DP address conflict.
  8. No RUN after power-up, STOP LED steady ON: MMC missing/damaged, firmware corruption, program error.
  9. فشل تنزيل البرنامج: Firmware mismatch in STEP7, wrong CPU order number selected in hardware configuration.
  10. Parameter loss after power cycle: Incorrect retentive area setup, MMC card not fully saved.
  11. Foreign Trade Information

رمز النظام المنسق: 85371011 (Programmable Logic Controller PLC)

Export Control: ECCN EAR99H, non-military item, normal industrial export.

  1. Inspection Checklist for Second-hand Units
  2. فحص بصري: No burn marks, no oxidation on backplane bus contacts, no water ingress or corrosion.
  3. اختبار التشغيل: Insert functional MMC card; CPU enters RUN mode normally without SF/BF alarms.
  4. Firmware reading: Read firmware V2.7 online via STEP7, cross-check with label order number.
  5. اختبار التواصل: Test MPI/DP ports separately to verify both DP channels are functional.
  6. Serial number verification: Read internal serial number to confirm non-relabeled refurbished module.

STEP7 Hardware Configuration Template|6ES7317-2AK14-0AB0 (CPU317-2DP, V2.7)

Applicable software: STEP7 V5.4 / الإصدار 5.5 / V5.7; TIA Portal Classic Mode can import this hardware configuration

رف: UR rack (S7-300 rail, رف 0)

  1. Rack Slot Allocation (HW Config)
SlotModule Nameرقم الطلب.ملاحظات
1PS307 Power Supply6ES7307-1EA01-0AA0 (24V 5A)Replaceable with 1KA01 (2أ), select according to load
2CPU317-2DP6ES7317-2AK14-0AB0, V2.7Dual DP ports: X1=MPI/DP; X2=independent DP
3~11Signal Module / FM / سي بيAs requiredالأعلى. 8 modules on main rack; IM365 / IM360+IM361 for expansion racks

⚠️ هام: This model has no Profinet Ethernet port, only two PROFIBUS-DP interfaces

  1. Core CPU Properties (Double-click CPU to open properties)

2.1 عام

رقم الطلب: 6ES7317-2AK14-0AB0

Firmware version: V2.7

Work memory: 1ميغابايت

Load memory: MMC dependent (8MB recommended, 6ES7953-8LG30)

2.2 ذاكرة

Retentive Settings

Memory bits M: MB0~MB15 set as retentive by default

Timers, Counters: Retention can be ticked

DB blocks: TickRetentivein DB properties, data saved to MMC after power loss

صورة العملية

Input PI: 8192 Bytes

Output PQ: 8192 Bytes

Partitioned process image available (OB1/OB35 partition refresh, suitable for high-speed DP bus)

2.3 دورة / Clock

Cycle monitoring watchdog: Default 500ms, maximum 6000ms

Minimum cycle time: Default 0ms

Clock memory byte: MB10 recommended (bit0~bit7:10هرتز,5هرتز,2.5هرتز,2هرتز,1هرتز,0.5هرتز,0.2هرتز,0.1هرتز)

2.4 Interrupt OB Blocks

Cyclic interrupt OB35: Default 100ms, adjustable 1~60000ms (100/200ms commonly used for DP control)

Hardware interrupt OB40, Diagnostic interrupt OB82, Rack fault OB86, DP slave fault OB87 enabled on demand

2.5 حماية

مستوى الحماية: 1(no protection)/2(read protection)/3(read-write protection)

Password: Configurable on site, activated after hardware configuration download

وضع: Protection level editable under STOP mode

  1. Dual DP Interface Configuration (شديد الأهمية: Two independent DP subnets)

✅Port X1: MPI / بروفيبوس-DP (Port1)

  1. نوع الواجهة: MPI or DP (mutually exclusive)
  2. Bus parameters:

معدل الباود: 187.5k / 500k / 1.5م / 12م (DP max.12Mbps)

عنوان المحطة: 2 مُستَحسَن (MPI default 2; DP master customizable 1~126)

Highest station address HSA:126

  1. وضع: موانئ دبي ماستر, can also be set as DP Slave

غاية: MPI programming download / Subnet 1 for distributed I/O and drives

✅Port X2: Independent PROFIBUS-DP (Port2, DP-only, no MPI)

  1. Create a new separate PROFIBUS subnet (physically isolated from X1)
  2. Bus parameters: Baud rate matched to slaves on this subnet, max.12Mbps
  3. عنوان محطة DP: Must not overlap addresses in X1 subnet, على سبيل المثال. 3
  4. وضع: موانئ دبي ماستر (الأكثر شيوعا), supports DPV0/DPV1

غاية: Subnet 2 for inverters and DP instruments. Load separation on two buses to reduce bus interference.

General bus rule: Terminating resistor ON at both ends of bus, OFF at intermediate nodes; single-end shielding earthing.

  1. Address Map Template (Default Range)

Input I: 0 ~ 8191 Byte

Output Q: 0 ~ 8191 Byte

Peripheral Input PI: 0 ~ 8191 Byte

Peripheral Output PQ: 0 ~ 8191 Byte

Memory bit M: 0~8191 Byte

Timer T: 0~2048

Counter C: 0~2048

Local data L: Max.32768Byte per priority class, max.2048Byte per FB block

  1. Recommended OB Block Template for New Projects

OB1: Main cycle

OB10: Time-of-day interrupt (كما هو مطلوب)

OB35: Cyclic interrupt (100آنسة)

OB82: Diagnostic interrupt (module fault alarm)

OB86: Rack/DP slave loss interrupt (mandatory for DP projects)

OB87: DP communication fault interrupt

OB121: Program error; OB122: Peripheral access error (retained to prevent CPU stop)

  1. تحميل & MMC Precautions
  2. MMC card must be inserted before downloading hardware configuration; download impossible without MMC.
  3. Firmware compatibility: Hardware library in STEP7 must contain CPU317-2DP V2.7; older hardware library cannot locate this CPU.
  4. CPU hardware replacement: Hardware configuration + user program must be re-downloaded. MMC cannot be transplanted directly.
  5. Dual DP master: Slaves configured separately on each DP subnet; cross-subnet direct addressing unavailable.
  6. أخطاء التكوين الشائعة
  7. Wrong model selection: Accidentally select 6ES7317-2EK14 (PN port version), causes compile error in hardware.
  8. Two DP ports assigned to same subnet: Bus conflict, BF LED flashing.
  9. Watchdog time set too short: DP bus failure triggers OB80 timeout and CPU stop.
  10. Insufficient process image size: I/Q address overflow with large-scale distributed I/O.
  11. Export Template Operation Guide
  12. Complete above settings in HW Config
  13. قائمة طعام: Station → Save and Compile
  14. Export as .cfg or export station in SIMATIC Manager for project archiving
  15. Backup: Export hardware configuration separately for reuse on similar production lines

السابق:

ترك الرد

ترك رسالة