- Basic Information
모델 해석
N: 슈나이더 일렉트릭 Low-voltage Terminal Product Series
K: Energy Meter Category
4G: Built-in 4G Wireless Communication Module
4: Design Serial Number
B: Special Function Version
Product Positioning
A 4G IoT smart energy meter launched by Schneider Electric, designed specifically for remote monitoring, prepayment management, and energy data analysis. It is suitable for residential, 광고, and industrial scenarios.
핵심 매개변수
| 매개변수 항목 | 사양 |
| Phase/ Wiring System | Three-phase Four-wire (3×220/380V) or Three-phase Three-wire (3×380V) |
| 정격전류 | 5(60)에이, 10(100)에이, 등. (expandable with current transformers) |
| Accuracy Class | Active Power: Class 0.5S / Class 1; Reactive Power: Class 2 |
| Frequency Range | 50/60헤르츠 (±5%) |
| Operating Temperature | -25℃ ~ +60℃ |
| Storage Temperature | -40℃ ~ +70℃ |
| 보호 등급 | IP51 (front panel), IP30 (meter body) |
| Communication Method | 4G (multi-network compatibility) + RS485 (Modbus/DL/T645 Protocol) |
| Dimensions (mm) | Approx. 126×110×71 (L×W×H) |
| Mounting Method | 35mm Standard DIN Rail (quick snap-on installation) |
- Product Features and Functions
- Powerful Metering Capability
Bidirectional metering of active/reactive energy (four-quadrant metering)
Measurement of phase-by-phase voltage, 현재의, power, and power factor
Support for 2nd-31st harmonic analysis (optional)
Recording of abnormal events such as voltage loss, current interruption, and reverse phase sequence
- 4G IoT Communication
Built-in 4G module with automatic network connection (includes 8 years of free data traffic)
Remote real-time monitoring; check electricity consumption data via mobile phone/PC anytime, anywhere
Support for MQTT/HTTP/TCP transparent transmission protocols, enabling seamless integration with energy management platforms
- Intelligent Management Functions
Prepayment management: Pay before use, automatic power cut-off when balance is insufficient
Multi-tariff (peak-valley-flat) billing with support for time period setting
Remote switch-on/off control (suitable for rental housing management)
Abnormal electricity consumption alarm (overload, leakage, voltage abnormality, 등.)
Frozen data (daily/monthly/yearly) storage for convenient electricity consumption analysis
- Safety and Reliability
Anti-tampering design with cover-opening alarm function
Encrypted data transmission to prevent tampering
Wide voltage operating range (85%-115% of rated voltage)
Built-in clock (accuracy ≤0.5 seconds/day) with daylight saving time support
III. 응용 시나리오
- Rental Housing/Apartment Management
Remote monitoring of electricity consumption of each tenant, with real-time display via APP
Prepayment function avoids electricity fee arrears
Remote power on/off control for convenient management
Daily detailed electricity consumption data, which can be used to determine occupancy status
- Commercial Complexes/Office Buildings
Zonal metering for accurate cost accounting
Energy consumption monitoring and analysis to optimize energy usage
Multi-tariff billing to reduce electricity costs
Integration with building management systems to achieve intelligent control
- Industry/Manufacturing
Equipment energy consumption analysis to optimize production processes
Load monitoring to prevent equipment failures
Power quality monitoring to ensure stable equipment operation
Electricity cost allocation for refined management
- Installation Guide
- Pre-installation Preparation
Essential Tools
Insulated tools (voltage tester, insulated gloves)
Screwdrivers (flathead/crosshead), torque wrench (2-4N·m)
Wire stripper (stripping length 8-10mm)
Cables (main circuit: ≥4mm² copper core wire; control circuit: ≥1.5mm²)
35mm DIN rail (length ≥15cm)
Cable terminals, cable ties, phase sequence labels
Safety Precautions
Power must be disconnected and no voltage confirmed before installation
Installation shall only be performed by certified electricians in compliance with electrical safety regulations
Inspect all wiring before restoring power after installation
- 설치 단계
Step 1: Meter Fixing
Select a dry, well-ventilated, and vibration-free location
Align the rail clips on the back of the meter with the 35mm DIN rail
Press down firmly until a “click” sound is heard to ensure secure installation (see Figure 1)
Step 2: Main Circuit Wiring (Three-phase Four-wire)
| Terminal Marking | Connection Content | Remarks |
| L1/L2/L3 | Three-phase power supply incoming lines (live wires) | Connected to the outgoing terminal of the circuit breaker |
| N | Neutral incoming line | Connected to the power supply neutral wire |
| T1/T2/T3 | Three-phase load outgoing lines | Connected to electrical equipment |
| TN | Load neutral line | Connected to the load neutral wire |
| PE | Grounding terminal | Must be reliably grounded (yellow-green dual-color wire) |
Operation Key Points
Strip wire insulation to a length of 8-10mm to ensure no exposed copper strands
Use matching terminals and crimp securely for good contact
Tighten screws to the specified torque (2-4N·m) to prevent loosening
Step 3: Control Circuit and Communication Connection
RS485 communication: Connect A to A, B to B, and ground the shielding layer
4G antenna: Screw the antenna onto the antenna interface of the meter case to ensure good signal reception
- Post-installation Inspection
Wiring Inspection
Confirm all connections are tight without loosening or short circuits
Check that the phase sequence is correct (L1→L2→L3)
Verify that the PE wire is properly grounded
Function Test
Turn on the power and check if the LCD display works normally
Inspect the status of indicator lights (power, communication, alarm, 등.)
Test remote connection via APP or management platform
Verify that functions such as prepayment and alarm work properly
- Operation and Maintenance
- Basic Operation
LCD Display
The main interface displays total electricity consumption (kWh)
Press the “▲” 그리고 “▼” keys to switch and display phase-by-phase parameters, power, tariffs, 등.
Press the “OK” key to enter the menu and view detailed information
Remote Access
Download the matching APP (예를 들어, Schneider EcoStruxure)
Bind the meter by scanning the QR code on the meter or entering the device ID
Real-time monitoring, parameter setting, and recharge via the APP
- Maintenance Recommendations
Regular Inspection (Monthly)
Check if terminals are loose (especially in vibrating environments)
Observe if the LCD display works normally without missing segments
Inspect communication indicator lights for normal operation (4G signal strength ≥ 2 bars)
Record meter readings and compare with electricity consumption data
Long-term Maintenance (Quarterly)
Clean the meter case with a dry cloth (solvents are prohibited)
Check if the installation is secure without displacement
Verify that the 4G antenna connection is intact
- 일반적인 문제 및 해결 방법
| Problem | 가능한 원인 | 솔루션 |
| No LCD display | 전원이 연결되지 않음 / incorrect wiring | Check power supply and wiring to confirm normal voltage |
| Communication failure | Weak 4G signal / data traffic arrears | Adjust antenna position and confirm valid data traffic package |
| Abnormal metering | Loose wiring / incorrect phase sequence | Check wiring, confirm correct phase sequence, and retighten connections |
| Remote control failure | Permission setting issues / network delay | Check APP permissions and retry the operation or try again later |
| Excessive meter heating | Overload / poor ventilation | Check load, ensure good ventilation, and reduce capacity if necessary |
Ⅶ. 요약
The Schneider NK4G4B Smart Energy Meter integrates high-precision metering, 4G remote monitoring, and intelligent management, making it an ideal choice for modern energy management. Proper installation and operation can bring the following benefits:
- Improve management efficiency: Remote monitoring replaces manual meter reading, enabling real-time control of electricity consumption anytime, anywhere
- Reduce operating costs: Prepayment management avoids arrears, and multi-tariff billing optimizes electricity expenses
- Enhance safety: Abnormal monitoring and alarm functions, combined with anti-tampering design, ensure electricity usage safety
- Data-driven decision-making: Detailed electricity consumption data analysis helps improve energy efficiency
설치 요점: Power-off operation, correct wiring (especially PE grounding), secure fixing, good ventilation, and antenna optimization.
Reminder: After installation, it is recommended to keep the product label and installation records for future maintenance and inspection. For technical support, please contact Schneider Electric customer service hotline.