Allen-Bradley 1756-BA2 Memory Backup Lithium Battery Assembly - Contactor,întrerupător de circuit,senzor,Codificator,PLC,Convertor

Wechat: +86-13184948252 Whatsapp: 0086-13811255435 E-mail: kent@bestcontactor.com

Despre Contact |

Allen-Bradley 1756-BA2 Memory Backup Lithium Battery Assembly - Contactor,întrerupător de circuit,senzor,Codificator,PLC,Convertor

electric/

Allen-Bradley 1756-BA2 Memory Backup Lithium Battery Assembly

Rockwell ControlLogix Controller Memory Backup Lithium Battery Assembly ✅ Model Definition 1756: ControlLogix 5560 platform series BA: Battery Assembly 2: 2nd-generation backup battery, only compatible with 1756-L6x B revision CPUs. Not interchangeable with 1756-BA1. 📌 Core Purpose When main power fails, it supplies power to the controller SRAM volatile memory to retain user programs, tag ...

  • Detalii despre produs

Rockwell ControlLogix Controller Memory Backup Baterie cu litiu Asamblare

✅ Model Definition

1756: ControlLogix 5560 seria platformei

BA: Battery Assembly

2: 2nd-generation backup battery, only compatible with 1756-L6x B revision CPUs. Not interchangeable with 1756-BA1.

📌 Core Purpose

When main power fails, it supplies power to the controller SRAM volatile memory to retain user programs, tag data, real-time clock and fault logs. Without this battery, memory data will be lost after power cycle, requiring program re-download.

Non-rechargeable lithium thionyl chloride primary battery.

📋 Key Technical Specifications

ArticolCaietul de sarcini
Cell ChemistryLi‑SOCl₂ Lithium Thionyl Chloride (Primary Lithium Battery)
Tensiune nominală3.0 VDC
Typical Capacity1200 mAh
ConectorRed/black lead wires with dedicated keyed connector
Temperatura de operare-40℃ ~ +85℃
Shelf Life (Uninstalled, 25℃)Aproximativ. 10 ani; annual self-discharge ≤1%
Durata de viață (Instalat, 25℃)Aproximativ. 5 ani; high cabinet temperature significantly shortens service life
Metoda de instalareCapacitate de schimbare la cald
Alarm SignalBAT indicator ON; Type10 fault code in Logix software, S:9/1 low battery status bit

🧩 Compatible Controllers

✅ Only for B revision L6x CPUs:

1756-L61B / L62B / L63B / L64B

❌ Revision A L6x CPUs use 1756-BA1. The two models have incompatible connectors and electrical characteristics and cannot be swapped.

📉 Product Lifecycle

Official Status: EOL End of Life. Sales termination date: 2027-12-31. Rockwell does not provide a direct OEM replacement model. Source genuine or compatible replacement batteries from the aftermarket.

🛠️ Maintenance & Depanare

  1. Back up the program before replacement. Hot-swap is supported, but program backup is recommended as a safety precaution.
  2. Low voltage threshold approx. 2.5V; battery alarm triggers below this value.
  3. Replace promptly after alarm to prevent data loss during unexpected power outage.
  4. Waste lithium batteries are hazardous goods. Dispose per hazardous waste regulations; do not discard casually.

📦 HS Code Reference

8537101190 (Electrical control assemblies)

⚠️ Common Misconceptions

  1. It is NOT a 24V power supply battery, despite incorrect labeling by many vendors. It is only a 3V memory backup battery and cannot power the entire PLC.
  2. Nereîncărcabil. Do NOT apply external charging power.
  3. L6A and L6B batteries are not interchangeable. Verify CPU serial number revision before ordering.

SOP: 1756-BA2 ControlLogix CPU Backup Lithium Battery Replacement

Dispozitive aplicabile: 1756-L61B / L62B / L63B / L64B (B-revision CPU)

Battery Model: 1756-BA2 (1756-BA1 is strictly prohibited as a replacement)

Modul de operare: Rack hot-swap (Recomandat; prevents SRAM loss of program, tags and clock)

Versiunea documentului: V1.0

Nivelul de risc: Scăzut; Hot-swap is forbidden in hazardous / zone explozive (power-down operation mandatory)

  1. Scop

Standardize replacement procedure for the 1756-BA2 backup lithium battery. Prevent loss of programs, etichete, real-time clock and fault logs; avoid ESD damage to CPU, short circuit and fire hazards of lithium batteries; establish maintenance records.

  1. Pre-Job Safety Requirements
  2. Operators shall be qualified and familiar with ControlLogix platform. Wear properly grounded anti-static wrist strap.
  3. Notify field operators before work, record production status. Isolate process interlocks if required.
  4. Instrumente: Anti-static wrist strap, small flat screwdriver, bandă izolatoare, multimetrul, notebook, Logix Designer / RSLogix5000 software.
  5. Spare part verification: New 1756-BA2, inspect for bulging or electrolyte leakage, confirm model label.
  6. Lithium battery warning: Lithium thionyl chloride primary battery, nereîncărcabil. Do not puncture, crush, incinerate or short circuit.
  7. Periculoase / explosive classified areas: Hot-swap prohibited. Lockout / Tagout (INIMA) power cut required. Power-down replacement will clear SRAM memory; full program download is required after replacement.
  8. Replacement Triggers

Replace when any condition below is met:

CPU front panel BAT red indicator steady ON

Logix software reports Type10 (Battery Fault), S:9/1 low battery bit set

Battery casing bulging or electrolyte leakage

Reaching scheduled maintenance cycle (5-year service life at 25℃; preventive replacement every 2~3 years if cabinet temperature>40℃)

  1. Pre-Work Preparation
  2. Connect PC to PLC, upload complete ACD project file online and make dual backup (local + server). Save recipes, tags and custom user data.
  3. Review CPU fault log, confirm only low battery alarm exists without other major faults; record fault codes.
  4. Confirm CPU revision is B-version (1756-L6xB). Confirm battery compartment is located at lower front of CPU.
  5. Inspect new battery: intact housing, undamaged connector; measure open-circuit voltage ≥3.0VDC.
  6. Prepare insulating tape for old battery to wrap terminals immediately after removal to avoid short circuit.
  7. Standard Operating Steps (Non-explosive Area | Hot-Swap)

Keep rack powered on. CPU can stay in Program or Run mode. Onboard CPU capacitor maintains SRAM power for short duration.

  1. Wear anti-static wrist strap and ensure good ground connection.
  2. Open battery compartment door on front of CPU, depress latch and gently pull out battery tray.
  3. Pinch connector latch, pull old battery connector straight out. Do not tug wires.
  4. Remove old battery and immediately wrap both terminals with insulating tape to prevent positive/negative short circuit.
  5. Retrieve new 1756-BA2, align keyed connector orientation with CPU socket, insert steadily until latch clicks into locked position.

Keyed connector prevents reverse insertion; do not force fit.

  1. Place new battery into tray, slide tray back into compartment and close compartment door.
  2. Online via software: clear old battery fault; observe BAT indicator. Red BAT light shall turn off within 5~10 seconds.
  3. Verifica: S:9/1 low battery bit reset, no new fault codes generated.
  4. Documentare: Mark replacement date and next scheduled replacement date on label inside control cabinet.
  5. Upload project again, verify program and tag integrity; confirm system clock works normally.
  6. Alternative Procedure (Explosive Area / Mandatory Power-Down Replacement)

⚠️ Power-down replacement clears SRAM memory; program, tags and clock will be lost. Complete backup must be finished beforehand.

  1. Perform LOTO lockout/tagout and cut rack power supply.
  2. Open battery compartment, disconnect old battery and insulate terminals.
  3. Install new battery, plug in connector and reset battery tray.
  4. Restore rack power and power up CPU.
  5. Connect PC to CPU, download full ACD program, recipes and tags.
  6. Calibrate CPU real-time clock, clear faults, validate I/O and interlock logic.
  7. Confirm normal equipment operation, remove LOTO handover back to operators.
  8. Post-Operation Verification Checklist (Mandatory Inspection)

✅ CPU BAT indicator extinguished

✅ Type10 battery fault cleared in Logix fault list

✅ Controller S:9/1 = OFF

✅ Controller system time correct

✅ Program, tag and recipe data consistent with backup copy

✅ No new Major Faults

✅ Battery connector no overheating, loose connection or corrosion

  1. Waste Battery Disposal (Lithium Thionyl Chloride Hazardous Waste)
  2. Terminals of removed battery must be insulated. Do not place bare terminals together with metal tools.
  3. Do not discard into general domestic waste. Hand over to qualified hazardous waste recycler as lithium battery hazardous waste.
  4. Do not incinerate, crush or submerge in water.
  5. Defecte comune & Note
  6. BAT indicator remains ON: Check connector fully seated; verify battery model is BA2; measure battery voltage; inspect socket pin corrosion.
  7. Strictly prohibit substitution by 1756-BA1, incompatible connector hardware.
  8. Complete hot-swap quickly. Do not leave battery disconnected for extended time (CPU internal capacitor hold-up time is limited).
  9. Do not touch leaking fluid if battery bulges or leaks. Wear gloves, seal separately and dispose as hazardous waste.
  10. Spare battery storage: Store in original packaging in cool and dry environment at 25℃, avoid high temperature.

1756-BA2 Backup Battery Application Scenarios

Compatible with Rockwell ControlLogix 1756-L61B / L62B / L63B / L64B (B-revision CPU)

Core function: SRAM memory retention battery, 3V primary lithium battery. Does NOT supply power to the whole PLC.

  1. Scenarii tipice de aplicare
  2. Continuous Process Production Lines (Cele mai comune)

Chimic, farmaceutic, hârtie, metalurgie, tratarea apei, cauciuc, plastic extrusion and other 24-hour continuous production.

Scenario feature: Unplanned shutdown not permitted; risk of grid voltage sag or short blackouts.

Battery function: Upon mains failure, maintain SRAM contents including user program, real-time tags, production recipes, fault history and system clock. Auto resume operation after power recovery, no program re-download required, no production data loss.

Operation preference: Hot-swap battery replacement without production interruption.

  1. Plant Utility & Auxiliary Systems

Compressed air station, circulating water, HVAC, cazan, electrical substation auxiliary control systems.

Scenario feature: Mostly unattended control rooms, frequent power disturbances, monitorizare de la distanță.

Battery function: Preserve alarm logs, accumulated metering data and system clock, maintain time synchronization with SCADA host, prevent clock reset after each power-up.

  1. Manipularea materialelor & Automatizarea depozitelor

Automated warehouse, linii de sortare, belt conveyor systems.

Scenario feature: Frequent equipment start-stop; motor inrush current causes voltage dips.

Battery function: Prevent SRAM memory corruption caused by voltage disturbance, avoid repeated program download and position data reset after power loss.

  1. OEM Export Complete Machinery

Large packaging machines, test benches, shield machine auxiliary controls, complete test rigs.

Scenario feature: Multiple power cycles during factory transportation and overseas commissioning.

Battery function: Retain CPU program and parameters during long-distance transport with power off. Equipment ready for commissioning once powered on at site.

  1. Periculoase / Explosive Classified Zones (Chimic / Ulei & Gaz)

Operation restriction: Hot-swap forbidden.

Cerinţă: Battery replacement must be performed with equipment LOTO and power off. Power-down replacement erases SRAM; program re-download required after replacement.

  1. Scenarii neaplicabile
  2. ❌ Cannot act as UPS backup power: Cannot supply power to CPU or I/O modules; only maintains SRAM memory. PLC will shut down for extended power outages.
  3. ❌ 1756-L6xA (Revision A CPU): Revision A CPUs use 1756-BA1. BA2 connector mismatch and cannot be installed.
  4. ❌ 1756-L7x / L8x New Generation ControlLogix: L7/L8 CPUs use onboard flash memory and do not require this external BA-series battery.

III. Maintenance Strategy by Scenario

Scenariul aplicațieiAmbient TempRecommended Replacement CycleReplacement Method
Air-conditioned central control room~25℃5-year preventive replacementHot-swap
High-temperature cabinet (Metalurgie / Hârtie, 40~55℃)Elevated2~3-year preventive replacementHot-swap
Hazardous classified areaOriceReplace on alarm + 3-year preventive cycleLOTO power-down replacement
OEM machine static storageRoom tempCheck voltage before shipment; replace if storage >7 aniMachine power-down replacement
  1. Scenario-Related Risks
  2. Mediu cu temperaturi ridicate: Accelerates battery degradation, early low-battery alarms and risk of catastrophic data loss upon power failure.
  3. Non-stop long-run plant: BAT alarms are easily overlooked. If battery fully depletes, power outage will erase programs and tags, leading to extended downtime.
  4. Repeated short power outages: Accelerates battery consumption and shortens service life.

1756-BA2 Battery Mounting Location (For direct insertion into SOP)

Applicable to 1756-L61B / L62B / L63B / L64B (B-revision ControlLogix CPU)

Physical Location

Small snap-on plastic access door for battery compartment on lower right of CPU front panel, adjacent to BAT indicator and serial port. Not on module top, rear or chassis backplane.

CPU plugs into slots of 1756 Şasiu. Battery compartment is integrated into CPU body, occupies no extra chassis slot.

A plastic battery tray sits inside the compartment. A dedicated 2-pin keyed socket is mounted internally. The 1756-BA2 with red/black lead wires plugs into this socket, and the battery cell rests inside the tray.

Quick A/B Revision CPU Battery Compartment Identification (Field Checkpoint)

  1. B-rev L6x (uses 1756-BA2): CF card slot is on CPU front panel. Battery compartment small door is lower right on front; open door for battery hot-swap.
  2. A-rev L6x (uses 1756-BA1): CF card slot is on CPU bottom. Battery compartment construction differs and BA2 cannot be fitted.

Structural Description (for SOP inclusion)

  1. Locuințe: Small snap latch access door on CPU front panel. Press latch gently and flip open.
  2. Internal: Plastic tray holding battery, red/black cable assembly with keyed connector plugged into onboard CPU battery header.
  3. BAT battery alarm LED: Beside battery compartment for direct visual battery status indication.

Field Operation Notes

Pull out tray after opening door, disconnect connector, replace battery, slide tray back and close door.

Hot-swap with rack powered on is permitted in non-hazardous areas.

Maintenance label can be pasted on inner side of compartment door to record battery replacement date (Rockwell recommended practice).

Rezumat dintr-o propoziție (SOP subsection: Locația de montare)

The 1756-BA2 battery is installed in the built-in battery compartment at the lower right of the front panel of 1756-L6xB series CPU. The compartment has a snap-on access door and an internal dedicated keyed battery socket holding the battery tray. The CPU is inserted into ControlLogix chassis slots. The battery compartment is part of the CPU and does not consume additional chassis slot resources.