Portable digital earth resistance meter (digital earth megger), used for lightning protection earthing, อุปกรณ์จำหน่ายไฟฟ้า, buildings, charging pile earthing engineering inspection. Supports 2-pole / 3-pole measurement.
- ข้อมูลจำเพาะหลัก
Earth resistance range: 0.01Ω~4000Ω; Accuracy ±(3%+3 ตัวเลข)
Earth voltage measurement: 0~200V AC (50/60เฮิรตซ์); Accuracy ±(1%+5 ตัวเลข)
แสดง: 4000-count LCD backlit screen with analog bar graph
การจัดเก็บข้อมูล: 100 measurement records. Supports MAX/MIN/AVG and REL relative measurement
แหล่งจ่ายไฟ: 8 × 1.5V AA batteries
ขนาด: 180×140×65mm; น้ำหนักสุทธิ: 950ก
ระดับความปลอดภัย: CAT III 600V, compliant with EN61010-1
ด้านสิ่งแวดล้อม: Operating temperature 0~40℃; Storage temperature -10~50℃; Humidity ≤85% non-condensing
Auto functions: 10-minute auto power-off, low battery indicator, limit value alarm
- Measurement Modes
- 3POLE 3-pole method: Standard earth resistance measurement (E-P-C three test leads + earth probes), preferred for engineering acceptance
- 2POLE 2-pole method: Simplified measurement, for scenarios with known good auxiliary earthing
- VE Earth voltage: Measures power-frequency stray voltage on earth electrodes to avoid abnormal readings caused by interference
- อุปกรณ์มาตรฐาน
หน่วยหลัก, 5m/10m/20m test leads, 2 earth probes, carrying bag, คู่มือการใช้งาน, แบตเตอรี่
- สถานการณ์การใช้งานทั่วไป
Lightning protection earthing inspection for buildings
Earthing test for high & low voltage distribution cabinets and motors
Earthing system acceptance for photovoltaic systems and charging piles
Earth resistance inspection for substations and communication rooms
- Operating Guidelines & การแก้ไขปัญหาทั่วไป
Operating Guidelines
- 3-pole measurement: Connect terminal E to the measured earth electrode; drive P and C probes into soil at specified spacing. Probes must be firmly seated. Pour water in dry soil to improve conductivity.
- Measure VE earth voltage before resistance test. High voltage indicates power-frequency interference; eliminate interference before measuring resistance.
- Pre-set resistance limit values; alarm triggers automatically when readings exceed threshold.
ข้อผิดพลาดทั่วไป
- Fluctuating readings: Poor probe contact, dry soil, strong on-site power interference. Check wiring and re-seat probes.
- Excessively high readings: Improper placement of auxiliary electrodes or damaged test leads.
- Failed measurement startup: Low battery or open test circuit.
- Alternative References
ภายในประเทศ: ETCR2000, ETCR3000 series earth resistance testers
นำเข้า: ฟลุค 1623/1625 earth resistance testers (ความแม่นยำสูงกว่า, ราคาที่สูงขึ้น)
HABOTEST HT2302 Earth Resistance Tester|Main Application Scenarios
การวางตำแหน่งแกนกลาง: 3-เสา / 2-pole on-site acceptance and inspection instrument for earth resistance. Simultaneously measures power-frequency stray earth voltage. Suitable for electricians, lightning protection inspectors, electromechanical maintenance engineers, security contractors and third-party safety inspectors.
🏢 Building Lightning Protection (ที่พบบ่อยที่สุด)
- Acceptance test of new building lightning protection earthing; test artificial earth electrodes and foundation earthing grids against GB50057 lightning protection standard.
- Annual routine lightning protection inspection: earthing check for factories, คลังสินค้า, อาคารสำนักงาน, roof lightning strips and lightning rods.
- Lightning protection earthing test for iron towers, outdoor monitoring poles and communication base stations.
⚡ Power Distribution & Electrical Equipment Earthing
- Protective earthing inspection for high/low voltage distribution cabinets, หม้อแปลงไฟฟ้า, power motors and distribution boxes
- Working earthing and repeated earthing test in power distribution rooms and pad-mounted transformers; earthing system verification before power-off maintenance
- Equipment shell earthing inspection for factory production lines to prevent electric shock hazards
🔋 New Energy & Charging Piles
- Acceptance and annual inspection for AC/DC charging pile earthing (earthing is mandatory safety requirement for charging piles)
- Earthing test for PV module brackets, inverters and combiner boxes in photovoltaic power stations
📡 Weak Current, ความปลอดภัย & Computer Rooms
- Equipotential bonding and anti-static earthing test for network and server rooms
- Earthing inspection for monitoring systems, barrier gates and access control weak-current equipment; prevent damage from static electricity and surge
- Earthing acceptance for public address systems and fire alarm control panels
🧪 Other Engineering Scenarios
- Anti-static earthing test for petrochemical workshops (tank farms and pipelines)
- Temporary power earthing inspection on construction sites for site power acceptance
- Preliminary soil resistivity survey to assist earthing engineering design
- On-site data logging for third-party testing agencies: 100-group storage for test reports
✅ Target Users
Certified electricians, lightning protection inspectors, electromechanical maintenance engineers, security contractors, third-party safety inspectors.
HABOTEST HT2302 Earth Resistance Tester|Full Operation Tutorial
Tutorial 1: Pre-inspection & Power-on Preparation (บังคับ)
- ติดตั้ง 8 AA batteries, ensure good contact in battery compartment. Replace batteries immediately when low battery icon appears; insufficient power causes reading drift.
- Inspect 3 test leads and 2 earth probes for broken wires or insulation damage. Polish oxidized alligator clips.
- Rotary switch positions: ปิด / ~VE Earth Voltage / RE 3POLE 3-pole / RE 2POLE 2-pole.
- Button description:
ทดสอบ: Start measurement
MEMO: Save readings (สูงสุด 100 กลุ่ม)
READ: Recall historical records
ซีแอลอาร์: Clear stored data
เรล: Relative measurement (eliminate lead resistance)
แสงไฟ: Enable backlight in low-light environments
Pre-safety requirement: Disconnect measured earth electrode from power grid. Never measure earth resistance on live equipment. Always measure ~VE earth voltage first.
Tutorial 2: 3POLE 3-pole Method (Standard Acceptance Method, ที่แนะนำ)
0.618 rule (golden ratio layout for potential probe), adopted for lightning protection, distribution cabinet and charging pile acceptance.
- สายไฟ
Terminal E: 5m short lead → clamp to measured earth electrode (earth flat steel / earth rod)
Terminal P: 10m lead → potential probe, placed between E and C
Terminal C: 20m long lead → current probe
- เค้าโครง (Three points in straight line)
Total distance E to C: 30ม; E→P=10m, P→C=20m (0.618 ตำแหน่ง)
Drive earth probes vertically ≥20cm into soil. Pour small amount of salt water at probe positions for dry/sandy soil to improve contact.
- ขั้นตอนการดำเนินงาน
1) Turn rotary knob to `~VE`, measure stray earth voltage. Do NOT measure resistance if voltage>5V. Power-frequency interference will distort readings; troubleshoot interference first.
2) Switch knob to `RE 3POLE`, confirm wiring.
3) Press TEST to start measurement and wait for stable reading.
4) Press MEMO to save stable reading; average multiple measurements.
- Reference criteria: Lightning protection generally ≤4Ω; power distribution protective earthing ≤4Ω; simple repeated earthing ≤10Ω (refer to corresponding national standards).
Tutorial 3: 2POLE 2-pole Method (Indoor Quick Measurement, Reference Only, NOT for Official Acceptance)
แอปพลิเคชัน: Indoor concrete ground where ground probes cannot be driven.
- สายไฟ: Short E and P terminals as one test clip; C terminal as second clip.
- Measurement principle: Use known good building earthing (water pipe, main building earth) as auxiliary ground to measure resistance between two points.
- การดำเนินการ: Switch knob to `RE 2POLE`, attach clips and press TEST.
⚠️Disadvantages: Low precision, only for rough continuity check. Cannot be used for lightning protection or charging pile acceptance reports.
Tutorial 4: VE Earth Voltage Measurement (Interference Check, จำเป็น)
- Turn knob to `~VE`, connect E and C terminals to measure AC power-frequency voltage on earth electrode.
- การทำงาน: Detect stray voltage on earth wire. Voltage reading indicates leakage or grid unbalance interference. Resistance measurement results are unreliable under such conditions; cut power and disconnect connections before retest.
Tutorial 5: REL Relative Measurement (Eliminate Lead Resistance, Improve Accuracy)
- Short all three clips E, P and C together.
- Enter corresponding resistance range and press REL. The meter auto-zeroes to cancel inherent resistance of test cables.
- Separate clips and wire normally for measurement. Strongly recommended for long lead measurements.
Tutorial 6: การจัดเก็บข้อมูล & Recall
- Press MEMO once reading stabilizes; screen shows storage index for successful saving.
- Keep rotary knob in measurement mode, press READ to browse stored 100 บันทึก.
- CLR button deletes single record or full dataset for post-site report preparation.
Tutorial 7: Rapid Troubleshooting Guide
- มีความผันผวน, unstable readings
Probe shallow insertion / dry soil; water probes and drive deeper. Keep away from power cables, inverters and high-power loads.
Rusty clips and poor contact; polish metal contact surfaces.
- OL infinite reading
Broken test lead, open clip connection or probes not buried into soil.
- Significantly high readings
Improper P/C probe alignment, three points not collinear. Underground metal pipes/rebar interference; reposition probes in another direction.
- Meter fails to initiate test
Low battery or poor terminal contact.
Tutorial 8: On-site Operating Specifications & Safety Prohibitions
✅แนะนำ
Test on cloudy days with moist soil. Avoid measurement immediately after heavy rain (excessive soil moisture causes distorted readings).
Disconnect lightning strips and equipment from earthing grid during earth grid testing to eliminate parallel circuit influence.
❌ต้องห้าม
Measure earth resistance while the system is live
Lay test probes directly under high-voltage cables
Issue official acceptance reports using 2-pole method
HABOTEST HT23xx Earth Resistance Tester Series List (Same Platform as HT2302)
The HT23 series are lead-type 3/2-pole earth resistance testers (requires ground probes, not clamp-on earth testers). Commercially available HABOTEST models:
✅ HT2301 (Basic Entry Model)
Measurements: 2-เสา,3-pole earth resistance + AC earth voltage
พิสัย: 0.01~2000Ω
พื้นที่จัดเก็บ: 50 บันทึก, no soil resistivity function
แอปพลิเคชัน: Simple earth inspection for electricians, temporary construction power; no soil resistivity measurement
การวางตำแหน่ง: Low-cost entry unit for basic routine screening
✅ HT2302 (Your Current Model, Mainstream Standard Version)
Measurements: 2-pole /3-pole earth resistance, earth voltage
พิสัย: 0.01Ω~4000Ω; AC earth voltage 0~200V
พื้นที่จัดเก็บ: 100 กลุ่ม, MAX/MIN/AVG, REL relative measurement, analog bar graph
พลัง: 8×AA batteries
การวางตำแหน่ง: Main model for lightning protection, charging pile and power distribution acceptance; highest sales volume
✅ HT2303 (High Version with Soil Resistivity)
Measurements: 2/3-pole earth resistance, earth voltage, soil resistivity ρ (4-pole method)
พิสัย: Earth resistance 0.01~4000Ω; Soil resistivity 0~4000kΩ·m
พื้นที่จัดเก็บ:100 กลุ่ม, limit alarm, เรล
การวางตำแหน่ง: Lightning protection labs and earth grid survey for soil resistivity design; upgraded version of HT2302
✅ HT2304 (Professional Enhanced Version)
4-pole soil resistivity, upgraded anti-interference circuit, AC earth voltage up to 600V
Operates under heavy power-frequency interference (สถานีย่อย, near high voltage lines)
Higher accuracy margin, preferred by third-party certification labs
Other HABOTEST Earthing-related Instruments (Not part of HT23xx lead tester series, reference for selection)
- HT5910: Loop resistance + RCD tester (measures loop resistance and residual current devices, NOT earth resistance tester)
- HABOTEST has no proprietary clamp-type earth resistance tester (clamp-on earth testers are separate category; ETCR is mainstream brand)
Model Selection Comparison Table
| แบบอย่าง | Soil Resistivity | Resistance Range | Storage Groups | Recommended Application |
| HT2301 | ❌ | 0.01~2000Ω | 50 | Simple inspection by electricians, งบประมาณที่จำกัด |
| HT2302 | ❌ | 0.01~4000Ω | 100 | ป้องกันฟ้าผ่า, charging pile and cabinet earthing acceptance (ใช้กันอย่างแพร่หลายมากที่สุด) |
| HT2303 | ✅ | 0.01~4000Ω | 100 | Lightning protection test + soil resistivity survey |
| HT2304 | ✅ | 0.01~4000Ω | 100 | High interference field, third-party professional testing |
คำแนะนำในการคัดเลือก
Only earth resistance acceptance (กองชาร์จ / building lightning / equipment protective earth) → HT2302 is sufficient
Require soil resistivity measurement and preliminary earthing grid design survey → HT2303
Sites near high voltage substations with heavy power-frequency interference → HT2304
คอนแทคเตอร์,เบรกเกอร์,เซ็นเซอร์,ตัวเข้ารหัส,บมจ,ตัวแปลง