Amperímetro de CA tipo puntero Chint 6L2-A 100/5A - contactor,cortacircuitos,sensor,Codificador,SOCIEDAD ANÓNIMA,Convertidor

chatear: +86-13184948252 Whatsapp: 0086-13811255435 Correo electrónico: kent@bestcontactor.com

Acerca de Contacto |

Amperímetro de CA tipo puntero Chint 6L2-A 100/5A - contactor,cortacircuitos,sensor,Codificador,SOCIEDAD ANÓNIMA,Convertidor

medidor de electricidad/

Amperímetro de CA tipo puntero Chint 6L2-A 100/5A

Core Parameters and Application Scenarios Specification Parameterspole box electrical Measuring Range: Connected via a current transformer, the nominal range is 100A (the actual input signal is the 5A secondary current of the transformer). Exactitud: Clase 1.5, meeting the requirements of conventional industrial measurement. Dimensiones generales: The mounting hole size is approximately 76mm × 76mm, adecuado ...

  • Detalles del producto
  1. Core Parameters and Application Scenarios
  2. Parámetros de especificaciónpole box electrical

Rango de medición: Connected via a current transformer, the nominal range is 100A (the actual input signal is the 5A secondary current of the transformer).

Exactitud: Clase 1.5, meeting the requirements of conventional industrial measurement.

Dimensiones generales: The mounting hole size is approximately 76mm × 76mm, suitable for installation in standard distribution cabinets.

Working Environment: Temperature -5℃ ~ 40℃, humedad ≤ 90%, altitud ≤ 1000 metros, applicable to indoor environments without strong corrosion.

  1. Aplicaciones típicas

Distribución de energía industrial: Monitoring three-phase or single-phase currents of equipment such as motors and transformers, p.ej., factory distribution cabinets and building distribution boxes.

Gestión Energética: Cooperating with current transformers (such as Chint RCT series) to realize real-time current monitoring of power systems, supporting lines below 0.66kV.

Suministro de energía temporal: Used as a basic current indicating tool in mobile distribution boxes at construction sites and temporary facilities.

  1. Supporting Equipment and Installation Points
  2. Selection of Current Transformer

Modelo recomendado: Chint RCT series annular transformers. The through-hole diameter should match the cable specifications (p.ej., RCT-60 is suitable for 60mm wire diameter), with a current ratio of 100/5A and accuracy of Class 0.5.

Requisitos de cableado: The secondary side (T1, T2) of the transformer must be connected in series with the ammeter, and the S2 terminal must be reliably grounded to avoid high-voltage hazards caused by open circuits.

  1. Pasos de instalación

Fijación Mecánica: Embed the ammeter into the panel of the distribution cabinet, tighten the fixing nuts on the back, and ensure the dial is vertical and flat.

Conexión eléctrica:

– Connect transformer S1 to the “+” terminal of the ammeter, S2 to the “-” Terminal, and ground it.

– For a three-phase system, three transformers and three ammeters need to be connected separately, paying attention to phase consistency.

Polarity Verification: Before powering on, use a multimeter to check the on-off status of the transformer secondary circuit to ensure there is no short circuit or open circuit.

III. Precio y canales de compra

  1. Cotización de mercado

Price per Unit: 19.75 yuan to 39.33 yuan. Se pueden negociar compras al por mayor..

Supporting Cost: The RCT-60 transformer is approximately 50 yuanes cada uno, and the configuration depends on the number of cables.

  1. Sugerencias de compra

Platform Selection: Industrial product platforms (como el centro comercial Lichuang) have transparent prices and sufficient spot goods. plataformas de comercio electrónico (Suning, taobao) are suitable for small-batch purchases.

  1. Solución de problemas y mantenimiento
  2. Handling of Common Problems

Pointer Not Moving:

– Check if the transformer secondary circuit is open and if the fuse is blown.

– Test whether there is current on the primary side of the transformer (p.ej., using a clamp meter) to rule out faults on the load side.

Abnormal Reading:

– Confirm that the transformer turns ratio matches the ammeter range (p.ej., a 100/5A transformer corresponds to the 100A scale).

– Clean the dial glass and pointer to avoid dust affecting observation.

  1. Mantenimiento regular

Inspección periódica: Clean the housing and terminals every quarter, and calibrate the accuracy every year (entrust a third-party institution if necessary).

Protección ambiental: Avoid use in high-temperature, húmedo, or strong electromagnetic interference environments. Install a protective cover if necessary.

  1. Upgrade Schemes and Alternative Products
  2. Recommended Intelligent Digital Meters

PA/PZ666 Series: Supports RS485 communication, alarma de exceso de límite, and data transmission, with an accuracy of Class 0.5. Suitable for scenarios requiring remote monitoring, precio de aproximadamente 60 ~ 120 yuan.

NXBLE Series Circuit Breaker Integration Scheme: Some residual current circuit breakers (such as NXBLE-63) have a built-in current display function, which can replace traditional pointer meters to realize integrated protection and monitoring.

  1. Model Replacement Instructions

– si el “6L2A” mentioned by the user is an old model, it may correspond to the 6L2-A series. The parameters of the two are compatible and can be directly replaced.

– For high-precision requirements (such as laboratories), it is recommended to choose the 42L6-A series (accuracy Class 1.0), precio de aproximadamente 22 yuanes por unidad.

  1. Safety and Compliance Tips
  2. Certificaciones y estándares

– The ammeter complies with the GB/T 13978-2008 estándar, and the transformer complies with GB/T 20840.2. Some models have passed the CCC certification.

– For export scenarios, models with CE and UL certifications should be selected (such as the international version of Chint RCT series).

  1. Especificaciones de operación

– It is strictly forbidden to disassemble the ammeter when the primary side of the transformer is live; the upper-level power supply must be disconnected first.

– Disconnect the transformer secondary circuit before long-term shutdown to prevent residual magnetism from affecting accuracy.

Anterior:

Próximo:

Deja una respuesta

Dejar un mensaje